Any property in City of London built or refurbished before 2000 may contain asbestos-containing materials (ACMs). The Georgian and Victorian townhouses and mansion blocks that make up much of City of London's housing stock fall within or immediately after the period of peak asbestos use in UK construction. The Control of Asbestos Regulations 2012 requires an R&D asbestos survey before any renovation or demolition works on a pre-2000 property.
Common locations for asbestos in City of London properties include artex ceilings and textured coatings, vinyl floor tiles and adhesive, pipe lagging and boiler cupboard insulation, insulation board around fireplaces and storage heaters, and cement roof sheets on outbuildings and garages.
All asbestos surveyors listed here are UKAS-accredited and P402-qualified. Laboratory analysis is carried out by accredited laboratories with results typically available within 48 hours. City of London has areas of clay or previously mined ground where subsidence risk is elevated โ something qualified surveyors here will assess carefully.
20 surveyors โ Asbestos Survey in City of London
Asbestos Survey in City of London โ Frequently Asked Questions
Management surveys for residential properties in City of London typically cost ยฃ150โยฃ350. Refurbishment and Demolition surveys โ required before any building works โ cost ยฃ350โยฃ700 depending on property size. Commercial surveys are priced based on floor area.
Properties in City of London built or significantly refurbished between 1950 and 1985 carry the highest risk. City of London's Georgian and Victorian townhouses and mansion blocks frequently contains artex ceilings, vinyl floor tiles, pipe lagging and insulation board โ all potential sources of asbestos-containing materials.
Yes โ under the Control of Asbestos Regulations 2012, anyone planning renovation or demolition works on a pre-2000 property in City of London must commission an R&D asbestos survey before works begin. This applies to kitchens, bathrooms, loft conversions, extensions and any works disturbing the building fabric.
A management survey for a typical residential property in City of London takes 1โ3 hours on site. Laboratory analysis of samples takes 2โ5 working days, and the final written report is typically delivered within 5โ7 working days of the site visit.
Yes โ if asbestos-containing materials are in good condition and not being disturbed, managing them in place is usually safer than removal. Your surveyor will record their location and recommend a re-inspection schedule. Removal is required only where materials are damaged, deteriorating, or will be disturbed by planned works.